Quotas
Document Information
Version: v2.1 Updated: 2026-11-12
Feature Overview
| Item | Content |
|---|---|
| Applicable Role | Model Provider and Model Consumer |
| Navigation Path | On-Prem > Quotas & Usage > Quotas |
| Page Route | /powerone/quota-usage/quota |
| Managed Object | AI accelerator, CPU, and memory quotas, plus resource occupancy for Runtime Instances and Online IDE |
Beginner Explanation
My quota is like a personal resource balance sheet. It shows how many instances can still be created and how much compute and storage can still be used.
Terms Quick Reference
| Term | Description |
|---|---|
| Quota | Resource upper limit available to a tenant. Common dimensions include GPU, CPU, memory, and specifications. |
| AI card | AI accelerator quota, which may include GPU, NPU, or other cards. |
| Used | Used resource amount. |
Recommended Operation Order
- Go to
Quotas & Usage > Quotas. - In
Quota Usage Overview, checkTotalandUsedforAI Accelerator,CPU, andMemory. - In
Accelerator Models, checkSpec QuotabyModel. - In
Resource Occupancy, check the occupation ofRuntime InstancesandOnline IDE, and click the>at the right end of a card for details. - When the quota is insufficient, release idle instances or contact the operator for an adjustment.
First-Time User Notes
Confirm whether the task concerns resource quota totals or Runtime Instance and Online IDE occupation, then follow the recommended order. If fields or state differ from expectations, check prerequisites before continuing downstream.
Prerequisites
- The current account has permission to view quotas.
- The operator has allocated resource quotas to the tenant.
- If quota adjustment is needed, target specification and business requirements are clear.
Page Description
Use this page to review AI Accelerator, CPU, and Memory quota and occupation, and the resource occupation of runtime instances and online IDEs.
The page contains five panels from top to bottom: AI Accelerator Occupancy Mix, Daily Peak Card Usage, Resource Occupancy, Quota Usage Overview, and Accelerator Models.
The current Model Consumer view is a read-only overview with workload detail entries. Its main page has no filter, export, or quota-adjustment controls.
Page Areas
| Field/Area | Description |
|---|---|
AI Accelerator Occupancy Mix | Shows the occupied accelerator models as a donut chart, with the model and card count in the legend and a Top Models line at the bottom. |
Daily Peak Card Usage | Shows the daily peak card usage for Last 7 Days as an area line chart, with Today Peak at the top-right. |
Resource Occupancy | Shows the Runtime Instances and Online IDE cards side by side, each with AI Accelerator, CPU, and Memory occupation. |
Quota Usage Overview | Shows Total, Used, Available, and Usage Rate for each Resource row. |
Accelerator Models | Shows Total, Used, and Available under Spec Quota for each Model row. |
> | Located at the right end of a Resource Occupancy card, used to open the occupation details of that type. |
Main Operations
View Resource Quotas
Applicable Scenario
Use this operation to check how much AI Accelerator, CPU, or Memory quota is still available, or to verify the specification quota by model.
Procedure
- Go to
On-Prem > Quotas & Usage > Quotas.
The following figure shows the overall page layout.

- In
Quota Usage Overview, checkTotal,Used,Available, andUsage Ratefor eachResourcerow. - For a resource row without an upper limit,
TotalandAvailableshowUnlimited, andUsage Rateshows∞ Unlimited. - In
Accelerator Models, checkTotal,Used, andAvailableunderSpec Quotafor eachModelrow.
Result Validation
- The
Resourcecolumn inQuota Usage OverviewcontainsAI Accelerator,CPU, andMemory, measured inAI card(s),vCPU, andGiB. - The column headers in
Accelerator ModelsareModelandSpec Quota. - The
Total,Used, andAvailablevalues in one row correspond to each other.
Notes
- A quota is an upper limit and is not equivalent to real-time idle resources in the underlying cluster.
- Redact quota values before sharing them.
View the AI Accelerator Occupancy Mix
Applicable Scenario
Use this operation to confirm which models make up the accelerators currently occupied.
Procedure
- Go to
On-Prem > Quotas & Usage > Quotas. - In
AI Accelerator Occupancy Mix, view the donut chart and the legend on its right. - Check the model name and card count in the legend, and the
Top Modelsline at the bottom of the panel.
Result Validation
- The model and card count in the legend match the
Modelrow andUsedvalue inAccelerator Models. - The card count is measured in
AI card(s).
Notes
- This panel reflects only the AI accelerator occupancy mix, not CPU or Memory.
- A model name is a grouped label shown by the platform, not a specific hardware identifier in the cluster.
View Daily Peak Card Usage
Applicable Scenario
Use this operation to judge whether card usage has been rising or falling recently.
Procedure
- Go to
On-Prem > Quotas & Usage > Quotas. - In
Daily Peak Card Usage, view the area line chart for theLast 7 Dayssub-title. - Check
Today Peakat the top-right of the panel, and theToday PeakandPeak Rangelines at the bottom.
Result Validation
- The horizontal axis is labeled by date, and the vertical axis is the card count scale.
- The
Today Peakvalue at the top-right matches theToday Peakvalue at the bottom.
Notes
- The peak is aggregated per day, which differs from the
Usedvalue inQuota Usage Overview. - The values change over time. Record the viewing time when quoting them.
View Resource Occupation
Applicable Scenario
When creation fails with insufficient quota, or when you need to confirm which type of workload occupies resources, view resource occupation details.
Procedure
- Go to
On-Prem > Quotas & Usage > Quotas. - In
Resource Occupancy, view theRuntime InstancesandOnline IDEcards shown side by side. - Check the occupation count under each card name, and the
AI Accelerator,CPU, andMemoryblocks inside the card. - Click the
>at the right end of a card to open the details drawer on the right side of the same page, without navigating away. - Type a keyword in the search box at the top of the drawer and click
Searchto filter the details, or clickResetto restore them.
The following figure shows the resource occupation details drawer, used to view instance-level resource usage.

- Check the detail table column by column: the occupied resource item, its state, and the CPU, accelerator and memory usage.
- After locating the occupying instance, go to the corresponding instance list for handling; the detail rows themselves are not clickable.
Result Validation
- The
AI Acceleratoroccupation inResource Occupancycorresponds to theUsedvalue inQuota Usage Overview. Runtime InstancesandOnline IDEare counted separately and are not merged.
Notes
- If the occupation details are empty but
Usedis not 0, a statistical delay may exist. - When the detail table is empty it shows
No Data, and the pager shows0 itemsand10 / page. - Quota reclamation may have a short delay after instances are released.
Identify Quota Risk and Open a Request
Applicable Scenario
Use this operation to judge which resource is near its limit, or to prepare the justification for an increase.
Procedure
- Go to
On-Prem > Quotas & Usage > Quotas. - In
Quota Usage Overview, locate the resource rows with a highUsage Rate. - A resource row whose
Usage Rateshows∞ Unlimitedhas no upper limit and is not judged by usage rate. - In
Accelerator Models, confirm which model the risk is concentrated on. - If an increase is required, contact the operator to adjust the quota and prepare the business justification.
Result Validation
- A resource row with an upper limit shows
Total,Used,Available, and a percentageUsage Ratetogether. - After an adjustment, open the page again and verify the result against
TotalandAvailableinQuota Usage Overview.
Notes
- Before requesting an adjustment, verify the amount and impact and execute the action only after approval.
- A usage rate reflects quota consumption only and does not guarantee that the cluster can create resources.
Parameter Quick Reference
Query and Filters
The query group lists the real controls of the page filter area. "As needed" describes how the control is used, not a backend required rule; "—" means this page does not specify an example.
| Field Name | Required | Field Type | Example | Description |
|---|---|---|---|---|
| Drawer search box | Optional | Text input | ide | Filters the resource occupation details, used with the Search and Reset buttons. |
Existing Fields
| Field Name | Required | Field Type | Example | Description |
|---|---|---|---|---|
Resource | System-generated | Enum | AI Accelerator | Resource category counted in the quota overview. |
Total | System-generated | Number / capacity | 5 AI card(s) | Upper limit currently available. Shows Unlimited when no limit is set. |
Used | System-generated | Number / capacity | 1 AI card(s) | Quota already consumed by current occupation. |
Available | System-generated | Number / capacity | 4 AI card(s) | Quota still available for resource creation. Shows Unlimited when no limit is set. |
Usage Rate | System-generated | Percentage | 20% | Ratio of Used to Total. Shows ∞ Unlimited when no limit is set. |
Model | System-generated | Text | Other Models | Grouped model label shown by the platform. |
Spec Quota | System-generated | Group | Total / Used / Available | The three quota values shown per model. |
Pitfalls
- When quota is sufficient but creation fails, actual cluster resources may be insufficient.
- If occupation details are empty but Used is not 0, statistical delay may exist.
Configuration Rules and Impact
- Quotas control tenant upper limits and are not equivalent to real-time idle resources in the underlying cluster.
- Online IDE and runtime instance occupation may be counted separately.
- Quota reclamation may have a short delay after instances are released.
Result Validation
| Check Item | Success Signal | If Abnormal |
|---|---|---|
| Page entry | Quotas opens with the quota and occupation panels | Check menu permission, current business identity, and tenant scope |
| Data scope | AI Accelerator, CPU, and Memory rows are visible, with separate Runtime Instances and Online IDE detail entries | Check the resource row and workload type; open the relevant detail entry if needed |
| Data update | Update time or latest record matches the expected cycle | Check whether the source job, metering, or quota record has been generated |
| Cross-check | Configuration, status, and relationships on Quotas matches its details, billing, or monitoring records | Compare the responsible detail page by object identifier and time range |
FAQ
No Records on Quotas
Symptom:
The page opens, but lists or statistics are empty.
Possible Causes:
- Filters are too narrow.
- source records are not generated.
- the role cannot see them.
Solution:
- Identify which quota panel is empty
- verify the source job or metering cycle
- check business identity and tenant scope.
Quotas Shows the Wrong Scope
Symptom:
Data does not belong to the expected time, region, or object.
Possible Causes:
- Time boundaries differ.
- the region filter did not apply.
- ownership changed.
Solution:
- Check the resource row and workload type
- verify object identifiers
- confirm ownership in source details.
Quotas Is Delayed
Symptom:
A source operation completed, but its record is not visible.
Possible Causes:
- Aggregation is not complete.
- the page is cached.
- source state is still processing.
Solution:
- Verify source state
- wait one aggregation cycle and refresh
- inspect the processing task if delay persists.
Details or Download Is Unavailable
Use View Details: Runtime Instances or View Details: Online IDE to open occupation details. The main page has no export control.
Symptom:
The details, expand, or download entry is disabled.
Possible Causes:
- The record does not support it.
- role permission is insufficient.
- the file is not generated.
Solution:
- Select an eligible record
- check role permission
- confirm the statistics or export task is complete.
Summary and Details Do Not Match
Symptom:
The summary differs from the total of individual records.
Possible Causes:
- Periods differ.
- values are rounded.
- some records are still processing.
Solution:
- Align period and time zone
- compare by object
- wait for pending records and check again.
Notes
- Sufficient remaining quota does not guarantee successful creation. Region, specification, image, storage, and cluster capability must also be satisfied.
- Do not expose tenant names, business project names, or internal resource IDs in screenshots.
- Quota refresh may be delayed. After releasing resources, wait until page update time changes.
Next Steps
- When remaining quota is insufficient, release unused instances, jobs, or storage resources.
- After confirming that business expansion is required, contact the operator to request a resource quota adjustment.
- When instance creation fails, verify resource quota, specification availability, and cluster capacity together.
- Periodically view resource quota changes to avoid long-running resources occupying all quotas.